Cody Dock bridge in action

Leigh Hatts

2 min read
Share Article
The bridge is almost upside down from its high rest position as it comes down to meet the paths each side.

Cody Dock’s bridge is a vital link in Lea Valley Walk allowing walkers to follow the tidal River Lea to its confluence with the Thames.

An existing temporary bridge on a dam at Cody Dock entrance will eventually be removed to allow large vessels, especially those with masts, to enter or leave. The new crossing is designed to give clearance for masts or funnels.

At present the two crossings are side by side with the new moveable pedestrian bridge having been in place since 2023.

On Saturday, as part of Lighting Up The Lea festival day, the new bridge was rolled open.

The bridge is manually rolled from its rest position on undulating rails using winches. The operation took about fifteen minutes with two people winding.

The steel and oak structure has been designed by Thomas Randall-Page.

The bridge in its resting position allowing rooms for sailing boats with masts to pass under. The temporary crossing is to the right.
The bridge rolling on its undulating rails.
Walkers enjoying the bridge which will be the only crossing here for the Lea Valley Walk when the dock is again operational.

Written by Leigh Hatts

View all posts →

Leave a Reply

Your email address will not be published. Required fields are marked *